Powered By Kitlog Pro v2.0
Jim's Web Site
Larcair ES
Fuselage
1-1-2019
< Previous Log Entry
Next Log Entry >
Date:
1-1-2019
Number of Hours:
2.50
Manual Reference:
Brief Description:
Pretty well finished the rough fitting of the cowl. I've decided not to drill mounting holes until the upper fuselage is bonded to the lower fuselage. I've learned that even small tweaks can mean a difference in fit, so I'll be in no hurry.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Larcair ES Home
Category
# Logs
# Hours
All
865
3519
Avionics
2
6
Cowling
1
1
Electrical
22
108
Elevators
125
289
Empennage
2
15
Engine
15
111
Flight Controls
31
108
Fuselage
213
1207
Horizontal Stab.
28
105
Instrument Panel
6
45
Interior
5
71
Miscellaneous
7
39
Paint
1
24
Rudder
5
71
Rudder
17
28
Vertical Stabilizer
29
128
Wings
356
1163
Copyright © 2001-2024 Matronics. All Rights Reserved.