KitLog pro

Powered By Kitlog Pro v2.0

Jim's Web Site
' style=
Date:  2-16-2016
Number of Hours:  2.50
Manual Reference:  
Brief Description:  

The primer has still not cured sufficiently to prevent sandpaper clogging, either wet or dry. So today I continued on the right leg fairing, and did a bit on the left inspection panel. There I had to add a small blister to clear the leg bolt. Earlier I had formed a carbon fiber blister, and last night bonded it to the panel. Today is covered the blister with micro, which tomorrow I will smooth out and cover with one bid, later to be followed with a thin micro coat. I also spent some time sanding last night's micro on the right leg fairing, added a bit of glazing afterwards, and sanded that down as well. All that's left on the underside of that fairing is to fix a few pinholes and prime.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.