The last two nights I continued placing micro fillets between the ribs and newly installed capstrips. Today I began installing the 2 and 3 bid layups to reinforce the outboard forward rib bays. This is a multi-day process, and will probably take a week or so. While looking over the inboard aft capstrip, I determined that it was not up to snuff, so I ripped it off, and will try again. I think that I must have moved the lower skin just a bit while lowering it into place. None of the above is reallly a good subject of photos.