KitLog pro

Powered By Kitlog Pro v2.0

Jim's Web Site
' style=
Date:  11-27-2012
Number of Hours:  3.40
Manual Reference:  
Brief Description:  

Completed potting in the electrical conduit today, then cut and fit the suggested stiffener for the leading edge. Since that stiffener runs the entire length of the wing, about fifteen feet, I made the stiffener out of four pieces of prepreg, from a piece left over from other parts. That required joining the parts at three joints. To do that, I placed the parts in place one at a time, with epoxy/flox in the recess between the parts, and placed a 1 bid patch at each joint. Tomorrow I'll reinforce each joint with 2 bid on each side, then micro in place for further reinforcement.
' style=

Leading edge electrial conduit

Leading edge electrial conduit

' style=

Leading edge stiffener

Leading edge stiffener

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.