Today I sanded the leading edge of the left elevator, and attached it to the horizontal stabilizer to check the gaps. The sanding went well, and the result looks great, but it didn't do much to even the gap between the elevator and the trailing edge of the hstab. So I marked the location of the hstab TE on the elevator in the full up and full down positions, so that I could get a better idea of where more micro needs to go.