Today was a big day - time to bond the upper and lower fuselage halves. This job required help, so Bill Hayllar, Steve Ashby, Jeremy Hull and Lester Longley came over to mix and spread Hysol, then position and lower the top to the bottom. After that, we secured the joints with sheet metal screws while the Hysol cured.