11-21-2017
< Previous Log Entry
Next Log Entry >
Date:
11-21-2017
Number of Hours:
1.50
Manual Reference:
Brief Description:
Reinforced the aft VS web with three bid, front and back. Also sanded the sternpost fillets in prepartion for reinforcing the forward joint. Aft joint is reinforced after closing the VS.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Larcair ES Home
Category
# Logs
# Hours
All
865
3519
Avionics
2
6
Cowling
1
1
Electrical
22
108
Elevators
125
289
Empennage
2
15
Engine
15
111
Flight Controls
31
108
Fuselage
213
1207
Horizontal Stab.
28
105
Instrument Panel
6
45
Interior
5
71
Miscellaneous
7
39
Paint
1
24
Rudder
5
71
Rudder
17
28
Vertical Stabilizer
29
128
Wings
356
1163
Copyright © 2001-2024 Matronics. All Rights Reserved.