Date:
5-7-2017
Number of Hours:
4.50
Manual Reference:
Brief Description:
There is progress to report. I've just about got the battery cables run, supported and terminated. All that's left is to finish the battery box so that the batteries are in their final mounting spots so that cable lengths are proper.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Larcair ES Home
Category
# Logs
# Hours
All
865
3519
Avionics
2
6
Cowling
1
1
Electrical
22
108
Elevators
125
289
Empennage
2
15
Engine
15
111
Flight Controls
31
108
Fuselage
213
1207
Horizontal Stab.
28
105
Instrument Panel
6
45
Interior
5
71
Miscellaneous
7
39
Paint
1
24
Rudder
5
71
Rudder
17
28
Vertical Stabilizer
29
128
Wings
356
1163
Copyright © 2001-2024 Matronics. All Rights Reserved.