Powered By Kitlog Pro v2.0
Jim's Web Site
Larcair ES
All
12-16-2018
< Previous Log Entry
Next Log Entry >
Date:
12-16-2018
Number of Hours:
8.00
Manual Reference:
Brief Description:
Yesterday and today I prepared and bonded the door frame to the upper fuselage. This is quite a fiddle, mainly because this is yet again the first time to do this rather precise task. Anyway, the frame is in, and I'm satisfied with the fit.
Frame bonded in
In progress
Essential assistant
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Larcair ES Home
Category
# Logs
# Hours
All
865
3519
Avionics
2
6
Cowling
1
1
Electrical
22
108
Elevators
125
289
Empennage
2
15
Engine
15
111
Flight Controls
31
108
Fuselage
213
1207
Horizontal Stab.
28
105
Instrument Panel
6
45
Interior
5
71
Miscellaneous
7
39
Paint
1
24
Rudder
17
28
Rudder
5
71
Vertical Stabilizer
29
128
Wings
356
1163
Copyright © 2001-2024 Matronics. All Rights Reserved.