KitLog pro

Powered By Kitlog Pro v2.0

Jim's Web Site
' style=
Date:  6-4-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  

This weekend continued working on sanding the HS, while I continue to wait for Garmin servo and mounts, as well as two inch scat hose for the cabin heat. Sanding micro on these relatively small areas is time consuming and physically strenuous. I'm so glad that I let Brad Simmons and his crew prep the wings. I have three of the four surfaces block sanded with 36 grit, but ran out of energy this afternoon on the fourth surface. Weather permitting, I'll finish that up tomorrow. Then I'll block with 80 grit, coat with Evercoat and start sanding again. Also found the time to finish up the twelve volt buses, identifying them with red and black nail polish.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.