KitLog pro

Powered By Kitlog Pro v2.0

Jim's Web Site
' style=
Date:  2-25-2016
Number of Hours:  3.00
Manual Reference:  
Brief Description:  

Yesterday and today more filling and sanding on the gear leg fairings and wheel pants, all in preparation for priming. Last night, on one side of a gear leg fairing I decided to put more micro on than I ever thought would possibly be necessary, to minimize the need for glazing putty. That strategy worked quite well, but there is a cost in material and labor. It actually didn't take a whole lot longer to sand, just about 20 minutes. I'll still have to apply glazing putty for minor surface defects and some pinholes. Pictured is the pile of sanded off micro.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.