More work tonight on the right flap inspection panels. Sanded down last night's micro, then laid out and cut the panels out. After that, I laid in the four bid, which will be the mounting flange. I figured out quite a while ago that four bid will not lay down well over an edge, even when beveled with micro. So now I apply two bid first, which does lay down pretty well, wait an hour or so for it to partially cure, then come back with another two bid layer.
Micro fillet sanded. Lines show location of capstrips.