Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
ES
All
6-23-2012
< Previous Log Entry
Next Log Entry >
Date:
6-23-2012
Number of Hours:
3.00
Manual Reference:
Brief Description:
Today I spent a lot of time sanding and prepping the left elevator capstrips for reinforcement. Then I began applying the 2 bid reinforcement. Got most of the capstrips reinforced, but not all.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
ES Home
All
Elevators
Empennage
Fuselage
Horizontal Stab.
Miscellaneous
Wings
Copyright © 2001-2013 Matronics. All Rights Reserved.