KitLog pro

Powered By Kitlog Pro v2.0

Legacy N222BZ
< Previous Log Entry          Next Log Entry >
' style=
Date:  3-15-2004
Number of Hours:  3.00
Manual Reference:  Sec 9B
Brief Description:  Canopy rollover.

Installed the rollover stiffening IAW the manual Section 9B. A 6 BID layup was applied inside the top of the rollover. The bottom 2 BID is 14" long. The next 2 BID is 12" long and the last is 10"long. 1/4" foam was then bonded on top with runny micro and let cure. Lastly, a 4 UNI layup was applied on top of the foam. The stiffener is now, theoretically, custom fit to the fuselage.
' style=

Lots of clamps to hold the rollowver.

Lots of clamps to hold the rollowver.

' style=

Carbon then foam epoxied into rollover.

Carbon then foam epoxied into rollover.

' style=

4-bid carbon will be applied over curved foam.

4-bid carbon will be applied over curved foam.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.