Kathryn was in charge of the horizontal tail closing. She sanded all the bonding surfaces and drilled all the drain/vent holes in each section of the horizontal tail to prevent damage due to pressure changes at altitude. The top surface was prepped, aligned and clecoed in place. Ready for closing.