KitLog pro

Powered By Kitlog Pro v2.0

Legacy N222BZ
' style=
Date:  3-15-2004
Number of Hours:  4.00
Manual Reference:  Sec 2F
Brief Description:  Prepping the horizontal tail.

Kathryn was in charge of the horizontal tail closing. She sanded all the bonding surfaces and drilled all the drain/vent holes in each section of the horizontal tail to prevent damage due to pressure changes at altitude. The top surface was prepped, aligned and clecoed in place. Ready for closing.
' style=

Drain/vent holes in each member.

Drain/vent holes in each member.

' style=

Prepping areas to be bonded.

Prepping areas to be bonded.

' style=

Prepped & ready to close.

Prepped & ready to close.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.