KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  8-20-2020
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Remaining Tasks Memo of 8/3/2020

See email folder for 8/3/2020 for orgininal note and updates.
Updated 8/20

1. Find the control stick and aileron throw limits in documentation DONE
2. Cut threads into autopilot connecting rods DEFERRED
3. Install autopilot connecting rods DEFERRED
4. Finish Flap Rigging DONE
5. Finish Steps install
6. Obtain Rubber Seals for wing fairings DONE
7. Install Wing Fairing
8. Install Flap GAP Fillet Fairing
9. Install windshield screws; check for cracks DONE
10. Check Nose Gear torque
12. Install Seats
11. Engine
a. Greg to double check throttle linkages DONE
b. Greg to double check choke linkages DONE
c. Greg to double check carb heat linkages DONE
d. Greg to double check cabin heat linkages DONE
e. Conduct fuel flow test (new item added 8/6) DONE ; 1 qt in 40seconds, 22.5 GPH
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.