KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  4-22-2020
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Next Steps

Complete Engine Items
X - Rewire left mag ground wire
X - Install baffle tie down
- Check Dynon D120 Battery Status; it's shutting off when master switch is turned off, it should stay on for 30 seconds
X - Run engine to determine fuel flow; tempurature sensors, ect
X - Install Brake System
X - Install Engine Cowling
X - Reconnect Rudder Cables
X - Fabricate Airleron Weights
X - Install/Checkout ELT
X - obtain and install caps for through fire wall holes.
X - Install and Wire ELT; one came with the kit but it may not be functional.
X - Fix heat muff control cable
X - Recut parking brake cable
X - Install Pitot, AOA, and Static hoses to back of D100.

- Install seat belts
- Run and log a fuel flow test
- Cut autopilot servo rods to size, thread and Install AutoPilot servo control rods; Greg suggests we do this at the hangar after we attach the wings
- Go over following connections and order/confirm hardware
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.