Powered By Kitlog Pro v2.0
Johns Zodiac XL Builder Log
Zodiac XL
Empennage
2-8-2006
< Previous Log Entry
Next Log Entry >
Date:
2-8-2006
Number of Hours:
2.00
Manual Reference:
Brief Description:
Drilling top skin
I got the top skin aligned. I could have used an extra set of hards for this. I have drilled and clecoed every third hole on the front spar and ribs. I also got the end ribs drilled and clecoed.
Clamped skin down with straps
end ribs in place and top skin clecoed.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Zodiac XL Home
Category
# Logs
# Hours
All
28
55
Empennage
28
55
Copyright © 2001-2024 Matronics. All Rights Reserved.