KitLog pro

Powered By Kitlog Pro v2.0

JEFFREY'S WEB SITE
' style=
Date:  2-27-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Oil lines

Installed the elbows on the oil hoses. Required the hoses to be heated in boiling water persses on with difficulty. Installed the oil line and thermostats on the engines.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.