KitLog pro

Powered By Kitlog Pro v2.0

JEFFREY'S WEB SITE
' style=
Date:  6-1-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Left horizontal stabilizer, right elevator

Finished applying the finishing tapes on the left horizontal stabilizer. Applied the second coat of Polybrush over the tapes.
Coated the right elevator frame with Polytack. Slid the fabric envelope on the elevator frame and began gluing it with Polytack.
' style=

Ready for final ironing and spraying

Ready for final ironing and spraying

' style=

Right elevator

Right elevator

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.