Powered By Kitlog Pro v2.0
JEFFREY'S WEB SITE
Aircam
Empennage
4-27-2016
< Previous Log Entry
Next Log Entry >
Date:
4-27-2016
Number of Hours:
8.50
Manual Reference:
Brief Description:
Horizontal stabilizer
Riveted the primed pieces for the left horizontal stabilizer togeather. It is ready for the fabric covering.
Assembled the right horizontal stabilizer with clecos. It is ready for disassembly and priming.
Left horizontal ready to cover
Right horizontal ready for disassembly
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Aircam Home
Category
# Logs
# Hours
All
238
889
Avionics
7
19
Avionics/electrical
38
136
Electrical
2
8
Empennage
40
170
Engine
20
88
Floats
10
35
Fuel system
2
4
Fuselage
8
30
Miscellaneous
28
98
Paint
29
112
Wing center section
27
94
Wings
27
95
Copyright © 2001-2024 Matronics. All Rights Reserved.