Powered By Kitlog Pro v2.0
JEFFREY'S WEB SITE
Aircam
Empennage
4-1-2016
< Previous Log Entry
Next Log Entry >
Date:
4-1-2016
Number of Hours:
5.00
Manual Reference:
Brief Description:
Verticle and left elevator
Finished riveting the fittings to the front stabilizer spar. Began working on the rear spar but had to stop due to a back ordered fitting. Went back to work on the left elevator. Drilled numerous hole out to #19 now that we have black clecos.
Front stab spar complete
Left elevator
Left elevator
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Aircam Home
Category
# Logs
# Hours
All
238
889
Avionics
7
19
Avionics/electrical
38
136
Electrical
2
8
Empennage
40
170
Engine
20
88
Floats
10
35
Fuel system
2
4
Fuselage
8
30
Miscellaneous
28
98
Paint
29
112
Wing center section
27
94
Wings
27
95
Copyright © 2001-2024 Matronics. All Rights Reserved.