KitLog pro

Powered By Kitlog Pro v2.0

JEFFREY'S WEB SITE
' style=
Date:  3-31-2016
Number of Hours:  4.30
Manual Reference:  
Brief Description:  Verticle Stabilizer

Deburred the front stab spar and spar doublers. Filed the edges of the doublers. Primed the front spar and other small part for the spar. Assembled the elevator hinge brackets. Deburred the rivet holes in the stabilizer ribs.
' style=

Stab rear spar

Stab rear spar

' style=

Elevator hinge brackets

Elevator hinge brackets

' style=

Stab spar doublers

Stab spar doublers

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.