KitLog pro

Powered By Kitlog Pro v2.0

JAMES'S WEB SITE
' style=
Date:  3-2-2004
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Panel layout

Installed panel and did autocad layout of panel to take to Steffis for Laser cuting. Located a better 1" bender and re did the 1" cooling tubes for the Rotax. Checked for clearance of insturments and determined that we have needed clearance.
' style=

Left side of eng after changing 1

Left side of eng after changing 1" tubing

' style=

Left side of eng after changing to 1

Left side of eng after changing to 1" tubing

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.