Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
II/IV
All
3-2-2004
< Previous Log Entry
Next Log Entry >
Date:
3-2-2004
Number of Hours:
5.00
Manual Reference:
Brief Description:
Panel layout
Installed panel and did autocad layout of panel to take to Steffis for Laser cuting. Located a better 1" bender and re did the 1" cooling tubes for the Rotax. Checked for clearance of insturments and determined that we have needed clearance.
Left side of eng after changing 1" tubing
Left side of eng after changing to 1" tubing
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
II/IV Home
Category
# Logs
# Hours
All
89
431
Empennage
1
5
Firewall Forward
32
181
Fuselage
18
82
Hardware
1
2
Interior
1
3
Shop Supplies
1
4
Wings
35
154
Copyright © 2001-2024 Matronics. All Rights Reserved.