Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
II/IV
All
3-1-2004
< Previous Log Entry
Next Log Entry >
Date:
3-1-2004
Number of Hours:
7.00
Manual Reference:
Brief Description:
Cooling System and Fuel System
Bent tubing and flaired upsets on heater lines. Installed SS clamps on fuel line covers. Installed and connected the heater hose's
Final Install of thermostat housing and return tube
Fire wall side of heater hose installation
Heater connection cabin side of firewall
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
II/IV Home
Category
# Logs
# Hours
All
89
431
Empennage
1
5
Firewall Forward
32
181
Fuselage
18
82
Hardware
1
2
Interior
1
3
Shop Supplies
1
4
Wings
35
154
Copyright © 2001-2024 Matronics. All Rights Reserved.