KitLog pro

Powered By Kitlog Pro v2.0

Jerrys Web Site
' style=
Date:  6-15-2015
Number of Hours:  7.00
Manual Reference:  
Brief Description:  Brakes

Today I worked to complete the barke line assembly. I planed to use locally procurred fuel line over the NylaFlow tubing to protect it from rocks etc., to Ultravilolet light. The first one, I spent over one hour trying to get it into the fuel tubing. Despite soap etc., I pushed and pushed etc. The second one took me five minutes, I left the tubing longer, and then chucked it tightly in my drill and twisted it in. Tonight, I ordered some brake fluid to fill the assembly and check for leaks.

I also removed the instrument panel and began to layout the drill points.
' style=

Brake Line Complete

Brake Line Complete

' style=

Getting Nylaflow into Brake Line

Getting Nylaflow into Brake Line

' style=

Brake Line Installation

Brake Line Installation

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.