Today, I drilled a hole in FUS 413, the rearmost upper tailcone wrap for the wires coming down through the leading edge of the tail fin to go through. I marked, drilled a 1/2 inch hole and then inserted a Shorty Bushing to protect the wires. Next, I removed the Upper Pulley Brackets, FUS 409, on Bulkhead FUS 343. When I installed the cables to the elevator, they rubbed against the holes in the Bulkhead drilled per the plans. So I had to lower the Pulley Brackets 1/4 inch. To do that, I had to make two new brackets. That took most of the afternoon to get it right.