Date:
10-6-2014
Number of Hours:
5.00
Manual Reference:
Brief Description:
Inner Floor
Wow -- all I did was drill holes. I spent the day laying out holes every 1 1/4 inch on each web and carrythough. I still need to final drill to #30 in the forward area as well as the #2 and #3 carrythroughs.
Cargo Area Final Drilled
Drilling to #40 Forward Floor
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cygnet SF2-A Home
Super Rebel 2500 Home
Category
# Logs
# Hours
All
898
3957
Aileron
16
72
Avionics
73
311
Brakes
2
4
Cowling
25
129
Electrical
14
35
Empennage
63
286
Engine
67
284
Final Assembly
30
142
First Flight
2
6
Flaps
9
40
Fuel System
3
13
Fuselage
333
1537
Helpful tips
2
0
Inspections
3
6
Landing Gear
2
10
Miscellaneous
9
26
Paint
37
156
Preparation
3
22
Seats
3
16
Tools
2
7
Transporting the Kit
3
8
Wings
197
847
Copyright © 2001-2024 Matronics. All Rights Reserved.