KitLog pro

Powered By Kitlog Pro v2.0

Jerrys Web Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  11-9-2017
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Move to Airport

Today, we moved the fuselage to the airport. My friends Dan, Bill, Ed and Pat helped. Of course, Cinder the dog!!!!! The gear didn't fit on the trailer, so I put the tail on a cross piece I built to move another project, and added 2x6 extensions on the back to hold the wheels. We pulled it up on ramps with a strap attached to the truck, and unloaded it in reverse. Once at the hangar, we put the wings on and then posed for the group photo! Finally, a couple celebratory beers!
' style=

Loaded and REALLY tied down

Loaded and REALLY tied down

' style=

Installing Wings

Installing Wings

' style=

The Help

The Help

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.