KitLog pro

Powered By Kitlog Pro v2.0

Jerrys Web Site
' style=
Date:  4-11-2017
Number of Hours:  6.00
Manual Reference:  
Brief Description:  More Wiring

Today, I worked to complete the wiring on the engine. I purchased some 1/2 inch ID clear poly tubing to check more fuel/oil lines. I then made a bracket out of angle to hold the Flowscan sensor on the bottom engine mount tube. I'm missing a couple of AN fittings again so quickly put in an order to ACS and Summit. Next, I made the alternator cable and the starter cable. I also wired the two alternators to their respectivre regulators. I still need to fashion standoffs for them. I ran both along the right oil sump and intend to use Adel type clamps to hold the cables in place. This is where I realized all my Adel clamps have 3/16 inch mounting holes. I'll need to drill them out.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.