KitLog pro

Powered By Kitlog Pro v2.0

Jerrys Web Site
' style=
Date:  8-3-2016
Number of Hours:  5.00
Manual Reference:  
Brief Description:  Floor Access Panels

Today, I drilled and installed rivnuts in the co-pilots side floor panel. I used a bit of epoxy on each keyed rivnut. In addition, I installed a B-nut on the parking brake valve. I purchased it from Vans Aircraft as Spruce lost their supplier. In addition, I made a hold down for the parking brake valve cable (right side of the picture).

Its good to be back at it -- a lot of traveling lately and getting the Cygnet ready for Oshkosh.
' style=

Parking Brake Hold Down Clamp

Parking Brake Hold Down Clamp

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.