Today, I worked to fabricate two nylon plates for where the aileron control cables pass through the posts. I also made sure all the pass throughs had enough clearance, and widened a few. Then, I turned my attention to the overhead FUS 65 pieces. I fitted them, drilled through the ceiling, cleaned, prep'd and primed, then made the clips that attach to the sides. Tomorrow, I'll make and install the gussets.