Powered By Kitlog Pro v2.0
JEFF'S WEB SITE
RV-9A
Empennage
2-5-2005
< Previous Log Entry
Next Log Entry >
Date:
2-5-2005
Number of Hours:
6.50
Manual Reference:
Brief Description:
Assembly
Made the two angles (HS-908). Match drilled both spars. Clecoed hinge bracket to rear spar and match drilled. Deburred all #30 Holes. Started cleaning edges and lightning holes on ribs.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
RV-9A Home
Category
# Logs
# Hours
All
53
433
Empennage
32
322
Wings
21
111
Copyright © 2001-2024 Matronics. All Rights Reserved.