KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  3-28-2018
Number of Hours:  2.00
Manual Reference:  Section 2
Brief Description:  New Glass and Silicone to seal

I was able to finish contouring the intake plenum foam and layup a decided 1 ply BID all around. I'll go ahead and add 2 more plies if needed though it may be more than I need. We shall see :)
I then taped off the inside of the access hole inside the passenger headrest area and injected black RTV around all the wires that will seal off the engine compartment and heat that comes with it. Though it was a very sticky and messy injection, the use of acetone soaked Q-Tips made for easy spreading and cleanup on the surrounding SS. It even looks better than the Red RTV I used years ago. Bravo to me :) After 24hrs, I'll pull the tape and she'll be finished.
As soon as the plenums are finished, I'll be running the new spark plug wires :) Cowl mods coming soon!
' style=

1 Ply BID all around

1 Ply BID all around

' style=

Taped off access hole

Taped off access hole

' style=

Black RTV injected

Black RTV injected

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.