KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  1-26-2017
Number of Hours:  3.00
Manual Reference:  Section 2
Brief Description:  3 Angle Valve job is done and here we go..

The 3 angle valve job was finished this week so I picked up the heads after paying $510 which included the 3 angle job and a 30 degree back-cut on the intake valves for a substantial increase in efficiency and airflow. RPM will tell the truth however.
All 6 heads went on painlessly and tomorrow will get the valves re-adjusted. I may even have time to fire her up over the weekend! The next challenge will be to isolate and fix the blow by issue which I hope doesn't require a new cylinder. We shall see. I still have 50 hours of ceramic treament to run through her before coming to that conclusion.
' style=

New Valves installed

New Valves installed

' style=

Heads are back on!

Heads are back on!

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.