KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  11-8-2016
Number of Hours:  0.50
Manual Reference:  Section 2
Brief Description:  Cooler gets RTV and cowling is back on

So far, my flight testing of the new dual pass oil cooler hasn't included a nice tight seal using RTV. I'm assuming then, that now that I installed the cooler with RTV, I should shave off another couple degrees or so. The scoop and cowling are no where near paint ready, but they are good enough for now as I'm wanting to fly more than work on this birdy. Before paint, I'll be flipping her upside down and installing nose gear doors, and perfectly contouring the underside as well. For now, she looks good enough.
' style=

New RTV seal and cooler is back on

New RTV seal and cooler is back on

' style=

Final contour looks great

Final contour looks great

' style=

And now she needs paint.

And now she needs paint.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.