KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  7-27-2015
Number of Hours:  2.50
Manual Reference:  Section 2
Brief Description:  Naca Foam fill and micro

I added small sections of blue and yellow foam around the gaps in the naca/fuse then laid up 1 ply of Carbon BID over the foam. I then spread Dry Micro over the BID. I took some Micro and filled the perimeter of the Duct/Firewall intersect as well. Not a bad job actually, but the West was setting up really fast. I had about a 7 minute window to spread it out. After cure, everything will be contoured down and I'll need to make my final decision on how to radius that Duct at the firewall.
' style=

Foam fillets around gaps

Foam fillets around gaps

' style=

Micro over Carbon Bid and Foam

Micro over Carbon Bid and Foam

' style=

Micro around firewall gap.

Micro around firewall gap.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.