KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  7-9-2015
Number of Hours:  2.00
Manual Reference:  Section 2
Brief Description:  Oil Cooler nutplates installed

Another one of those, "sure wish I had the right tools" jobs. Not worth the drive home to get em so it took 2 hours to install 3 nutplates with flox and UNI over the job.
I couldn't justify riveting them in from inside the hell hole so I floxed em in just like I did on other bolts where the head was floxed in. Shouldn't be a problem at all.
This is one of those final, "cramped place" jobs to be done so it's all smiles going forward :)
' style=

Nutplates floxed in

Nutplates floxed in

' style=

cooler in position with bolts in

cooler in position with bolts in

' style=

Another view

Another view

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.