KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  2-19-2015
Number of Hours:  3.00
Manual Reference:  Section 2
Brief Description:  2 new Oil cooler lines

Well I cut and made 2 new oil cooler lines with open ends on the engine side. I went to the airport and installed the lower cowling to check for the needed line lengths and found that these big ol -10 lines are gonna need the use of angled fittings at the engine side in order to fit inside the cowling. Man this oil cooler business is gonna cost me just as much as the engine before I know it...
In other news, the scoop on made was a wee bit wider than it should have been so if the "size" turns out to work ok, then a new one will need to be made. Not a bid deal really as it only took half a day to make this one.
' style=

almost

almost

' style=

New fittings are needed

New fittings are needed

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.