Date:  1-28-2015
Number of Hours:  1.50
Manual Reference:  Section 2
Brief Description:  Oil Cooler Plenum install and test

It took some coordination to run a bead of FAST curing RED RTV around the perimeter of the oil cooler plenum and then install all 6 bolts with all that jazzy hardware, but thanks to cooler hangar temps it set up just after I was finished. I then took the vacuum cleaner hose and blew air up into the plenum and tried to see if any air was leaking around the plenum. I did feel a little leakage on the right side so I will need to order more RED rtv and close it up completely unless temps prove to be ok as is. We'll know later.