KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  12-18-2014
Number of Hours:  1.50
Manual Reference:  Section 2
Brief Description:  Oil cooler bracket construction

The 10-32 nutplates were installed on the cooler bracket. I then, made 3 aluminum tubes to brace the fore and aft cooler lips that will house 3, 4-1/8" an3 bolts that will attach the cooler to the bracket. There have been reports of cooler lips cracking as well as brackets cracking due to vibration. I'm going to use o-rings to help isolate the cooler from the bracket and reduce the likelihood of this happening to me.
' style=

Nutplates

Nutplates

' style=

aluminum bracing tubes

aluminum bracing tubes

' style=

o-rings to reduce vibration

o-rings to reduce vibration

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.