KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  12-13-2017
Number of Hours:  0.50
Manual Reference:  Section 2
Brief Description:  Top cowl is trimmed and primed for micro and foam

The new air box requires major changes to the upper cowling. The glass was trimmed and prepped for micro on the leading edge. After the leading edge is contoured, I will be able to match the turtle deck and scoop with Micro and head on to final primer before paint. This will then allow me to paint the air box exterior and then install the SS firewall. All things in order :)
' style=

All trimmed to fit and ready for micro

All trimmed to fit and ready for micro

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.