KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  5-15-2018
Number of Hours:  1.50
Manual Reference:  ch 25
Brief Description:  Cowls sanded and ready for install

Both cowls got sanded with 320 Grit. The top cowling had the oil door installed, which was not finished in white and will most likely be one of those rainy day tasks. The bottom cowling turned out really nice as I lowered the pipe exits to about 1/2" instead of the first version which stuck out further. Now I need to add the Heat shielding to the areas that come close to the pipes. The pipes should be arriving this week as well. Perfect timing.
' style=

Oil Door installed after 320 grit sanding

Oil Door installed after 320 grit sanding

' style=

Smooth and ready for flight

Smooth and ready for flight

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.