KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  4-11-2018
Number of Hours:  6.00
Manual Reference:  ch 25
Brief Description:  2 more rounds of Z and Red primer

So. Much. Sanding. It was sanding last nights micro for 2 hours. Then 2 more rounds of Z-Grip for low spots, and still a few here and there, but I'll wait till primer comes before I tackle those. For now, I was able to get her what I'd call "90%" finsihed and with my favorite new Duplicolor Filler primer which will act as a guide coat. I'm now wondering how long that primer will stay on my concrete walkway :).
tonight, I'll head back into the shop to add micro to the cowls leading edge to bring the gaps closer to the final product.
' style=

2 rounds of Z-Grip over sanded micro

2 rounds of Z-Grip over sanded micro

' style=

ready for guide coat primer

ready for guide coat primer

' style=

2 coats Duplicolor Primer

2 coats Duplicolor Primer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.