KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  11-16-2017
Number of Hours:  6.00
Manual Reference:  ch 25
Brief Description:  Plenum and scoop get more micro

Today was an endless day of spreading micro, baking it and sanding. Then repeat of course :) It's all part of the old school fiberglass process. Yippee. So each piece got 2 rounds of micro and sanded which is pretty good for 1 day. The air filter box now has the scoop attached and micro applied. It will still need an emergency air flap, drain line, and the throttle body tube connected so we still have some work to do. The 2" to 60mm elbow needed micro inside which sucks, but whatever. The aft oil cooler plenum is coming along well with 2 rounds of micro setup. She will be in paint soon.
Still trying to decide on how the cowling will fit to the air box scoop and I have some Ideas, but not sure yet how to implement them. More to come.
' style=

Ugly Micro on air box

Ugly Micro on air box

' style=

Micro inside TB tube

Micro inside TB tube

' style=

2 rounds on the cooler plenum

2 rounds on the cooler plenum

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.