Brief Description: Canard and elevators moving along
The canard was agressively sanded down using 36 grit all over. Then I added Z-Grip to the low spots because my West Systems had run out. I then contoured everything down as best I could to 36 grit and have prepped the entire canard for a few thick slurry coats. The slurry coats are like skim coats but adding micro for a thicker build. It keep the pin holes away as well :) I also finished wrapping the other elevator so now all that is left is to add edge sealer to all the joints that aren't in plain site. The sealer will keep those edges from coming up.