Well, without going into all the detail, I have done a lot of the fill, prime, sand repeat thing. I also installed the nutplates for the lower cooler tab and bulkhead that will be bonded into the firewall. The reason I'm trying to get this thing as finished as possible is to avoid any finishing that would be required under the plane. I've got it to the point now that the Naca duct will be getting wet sanded and the naca scoop portion will be going through another round of filler and primer. I'm thinking that she will be ready for install by thursday. :)