KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  7-21-2015
Number of Hours:  10.00
Manual Reference:  ch 25
Brief Description:  close to install

Well, without going into all the detail, I have done a lot of the fill, prime, sand repeat thing. I also installed the nutplates for the lower cooler tab and bulkhead that will be bonded into the firewall. The reason I'm trying to get this thing as finished as possible is to avoid any finishing that would be required under the plane. I've got it to the point now that the Naca duct will be getting wet sanded and the naca scoop portion will be going through another round of filler and primer. I'm thinking that she will be ready for install by thursday. :)
' style=

Lower nutplates and bulkhead

Lower nutplates and bulkhead

' style=

Dry Fit assembly

Dry Fit assembly

' style=

3 rounds of Sprayed Primer

3 rounds of Sprayed Primer

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.