KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  5-22-2014
Number of Hours:  1.50
Manual Reference:  ch 25
Brief Description:  1 gallon of Z-Grip please

It took 1 gallon of Z-Grip to cover the remaining areas on the bottom of the fuselage. I went as far as I could without hitting the plies of BID that were curing. Tomorrow I'll be Z-Gripping the rest and then begin sanding it all down in prep for the siurry coat of joy. :)
Moving right along with these 75 hrs a week in the shop :)
' style=

grip love

grip love

' style=

girp love

girp love

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.