KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  4-9-2014
Number of Hours:  9.00
Manual Reference:  ch 25
Brief Description:  More filler work

9 hours of fill, sand, repeat all over the fuse. I started in the back and went forward. a lot of time was spent on the turtle deck/ canopy transition then into the air inlets. I then finished up the longeron/canopy transition and added a radius at the strake. I then filled all the voids on the fuse sides and nose. Finally I decided to tackle the canards leading edge that was not straight at all. In fact both leading edges needed filler. I've got them level but they need a couple more rounds of filler to flush out the small voids.
- I also got word today that my Avionics Panel, Silver Bullet Prop, and Seat Cusion are all in the mail on their way. :) perfect timing.
' style=

transition filler

transition filler

' style=

radius  corner

radius corner

' style=

leading edge filler

leading edge filler

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.