KitLog pro

Powered By Kitlog Pro v2.0

Building Integrity
' style=
Date:  9-17-2013
Number of Hours:  6.00
Manual Reference:  ch 25
Brief Description:  Fit and Finish

The final skim coat was sanded down. The aileron was fitted, sanded and faired into the wing and clearances were made. The final steps will be to install the rudder and finish the lower portion, faring it into the wing as well. After this the wing will be ready to flip over and we start on the top and winglet. moving right along...
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.